Find a calculator ↗Order Picking Labor Cost Calculator
Estimate order picking hours and labor cost from order volume, lines per order, and handling time. Include a fixed daily setup allowance.
Free to useNo signupUSD · Business planningYour results
Enter your values and calculate.
Calculations run in your browser. This calculator does not submit your entered figures to our server.
What is this order picking labor cost calculator?
This calculator converts order lines into picking labor hours and values those hours at your loaded labor rate. A line is one distinct item entry on an order. Picking three units from a single line may take a different amount of time than picking three separate lines, so the average time should match your workflow.
How to use the calculator
Enter daily orders and average pick lines per order. Use a measured average handling time that includes normal travel and scanning. Add fixed setup or closeout person-hours only when they are not already included in the line time. Enter your loaded hourly cost.
Check the input assumptions
Review the help text beneath each field before calculating. Enter amounts in US dollars where shown and use consistent units. Change one assumption at a time to understand which inputs affect your result.
Formula and worked example
Example calculation
With 200 orders, three lines per order, and 45 seconds per line, variable picking takes 7.5 hours. Add two setup hours for 9.5 person-hours. At $25 per hour, the daily labor estimate is $237.50, or about $1.19 per order.
These numbers illustrate the calculation; they are not recommended rates or industry benchmarks.
How to interpret your result
Compare the required person-hours with the productive hours available from your team. This is an aggregate workload estimate, so it does not show whether enough pickers are available at a peak cutoff time.
What the estimate leaves out
The estimate assumes average line effort stays constant as volume changes. It does not model congestion, batching, stockouts, shift schedules, or overtime rules. Fixed setup costs still apply when you enter zero orders.
Frequently asked questions
What is a pick line?
A distinct product entry on an order. Use the same definition in both your order data and measured seconds per line.
Should travel time be included?
Yes, if it is part of normal picking. Include it in the measured average or as separate labor, but not both.
Does the result include packing?
No. Add packing only if you deliberately included that effort in your inputs, and label that broader scope in your records.
Can I enter fractional lines per order?
Yes. An average such as 2.6 lines is valid even though individual orders contain whole lines.
Why is there a cost with zero orders?
The fixed daily hours still incur modeled labor cost. Cost per order is undefined when no orders are entered.
Related tools and categories
Complete Order Fill Rate Calculator
Calculate the percentage of orders filled completely on the first shipment. See how many orders missed the complete-order standard.
Use calculator →Explore Order Fulfillment calculators or all free business calculators.
Find more tools for your next business decision
Explore free business calculators for pricing, staffing, marketing, operations, and cash flow. Choose a calculator or browse categories to find the next useful estimate.